27 July 2009

Watch House Update

Started the walk way for the watch tower over the weekend. I've cut in and fitted the joists, as well as sorted out the wooden boards. I now need to tidy up the joists to fit better, then detail the boards a little.

After that it needs a hand rail and four corner supports and a roof.



I have also started the watch house part which will be linked to the tower via a bridge (to the open arch way half way up). The ground floor will be solid stone with no entrance, then up the front will rise a stairway. Behind will be stables underneath the overhanging first floor.



I really need to sort out some sketches, but it all kind of makes sense in my head, so I guess that's what counts for now!